• DocumentCode
    1423413
  • Title

    Raising fault capacity with air-core reactors

  • Author

    Haymes, T. W.

  • Author_Institution
    Shell Oil Company, Wood River, Ill.
  • Volume
    68
  • Issue
    10
  • fYear
    1949
  • Firstpage
    845
  • Lastpage
    845
  • Abstract
    IN AN expanding industrial plant, it frequently becomes necessary to increase the transformer capacity at a substation to care for heavier power demands at some particular location. An increase in the power capacity of the substation in turn increases the potential short-circuit kilovolt-amperage that might be applied to the substation bus. An increase in the capacity of the primary system furnishing power to the substation transformer also can increase the potential short-circuit kilovolt-amperage available on the secondary bus.
  • Keywords
    Circuit faults; Current transformers; Fault currents; Inductors; Oil insulation; Rivers; Substations;
  • fLanguage
    English
  • Journal_Title
    Electrical Engineering
  • Publisher
    ieee
  • ISSN
    0095-9197
  • Type

    jour

  • DOI
    10.1109/EE.1949.6432504
  • Filename
    6432504