DocumentCode
1427178
Title
The Brownlee hydroelectric project
Author
Soule, G. B. ; Heikes, T. R. ; Mitchell, W. B. ; Schaufelberger, O. E.
Author_Institution
Idaho Power Company, Boise, Idaho
Volume
79
Issue
3
fYear
1960
fDate
3/1/1960 12:00:00 AM
Firstpage
181
Lastpage
181
Abstract
THE BROWNLEE PROJECT is the first step in the comprehensive development of the middle stretch of the Snake River between Weiser, Idaho, and the upstream end of the Hells Canyon gorge. The ultimate development will consist of three projects, developing a total head of 602 feet with an initial installed machine capacity of 822,000 kw. A Federal Power Commission license was issued August 4, 1955, for the construction of the three projects. Design drawings were approved by the Commission on November 3, 1955, and construction was started at Brownlee a week later. Within the short space of 32 months, the first unit was pumping power into the interconnected systems of the Northwest Power Pool At the peak of the construction effort, 3,400 workers and $7 million worth of heavy construction equipment were used.
Keywords
Generators; Hydraulic turbines; Magnetic heads; Rivers; Rocks; Steel; Welding;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1960.6433097
Filename
6433097
Link To Document