Title :
Electrical features of the Niagara power project
Author :
Thorgerson, T. E. ; Basilesco, J.
Author_Institution :
Chas. T. Main, Inc., Boston, Mass.
Abstract :
The 2.19-million-kw Niagara Power Project, now well on its way to completion, will be the largest hydroelectric installation in the Western Hemisphere, if not in the world. The salient electrical design features of the project are described.
Keywords :
Circuit breakers; Generators; Oil insulation; Power generation; Power transformer insulation; Switches;
Journal_Title :
Electrical Engineering
DOI :
10.1109/EE.1961.6433463