• DocumentCode
    1429391
  • Title

    A model of fossil fueled plant with once-through boiler for power system frequency simulation studies

  • Author

    Inoue, Toshio ; Taniguchi, Haruhito ; Ikeguchi, Yasuyuki

  • Author_Institution
    Central Res. Inst. of Electr. Power Ind., Tokyo, Japan
  • Volume
    15
  • Issue
    4
  • fYear
    2000
  • fDate
    11/1/2000 12:00:00 AM
  • Firstpage
    1322
  • Lastpage
    1328
  • Abstract
    A model of a fossil fueled generating power plant with a once-through boiler for power system frequency simulation studies is presented. In the model, the plant control system is modeled to represent the fundamental response of the coordinated boiler-turbine control in the large-size supercritical plants under changes in the system frequency. The model is based on a survey of configurations of the plant control systems used in the major units commercially operated in Japan. The values of the parameters in the model are described through the comparisons with plant responses in a field test and with simulation results from a detailed model of the plant manufacturer. Sample simulation results from the model are presented for demonstrating the fundamental response of the once-through plants under change in system frequency
  • Keywords
    boilers; control system analysis; frequency response; power station control; steam power stations; steam turbines; Japan; control simulation; coordinated boiler-turbine control; fossil-fuelled power plant model; frequency changes; fundamental response; once-through boiler; power plant control system; power system frequency; Boilers; Computational modeling; Control system synthesis; Control systems; Frequency; Power generation; Power system modeling; Power system simulation; Pressure control; Valves;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/59.898108
  • Filename
    898108