DocumentCode :
1430183
Title :
Economics of primary distribution voltages of 4.16 through 34.5 kv
Author :
Smith, J. A.
Author_Institution :
General Electric Company, Schenectady, N. Y.
Volume :
80
Issue :
2
fYear :
1961
Firstpage :
119
Lastpage :
124
Abstract :
Cost comparisons are given for systems with primary distribution of 4.16 and 12.5 kv, as well as the more recently introduced higher voltages of 20.8 to 34.5 kv. Load densities varying from 1,000 to 32,000 kva per square mile are considered in the study.
Keywords :
Arresters; Companies; Economics; Lightning; Loading; Substations; Voltage control;
fLanguage :
English
Journal_Title :
Electrical Engineering
Publisher :
ieee
ISSN :
0095-9197
Type :
jour
DOI :
10.1109/EE.1961.6433641
Filename :
6433641
Link To Document :
بازگشت