• DocumentCode
    143043
  • Title

    Pyro and raw mill modifications to achieve 2,200 STPD

  • Author

    McKervey, Gerry ; Miller, S.W. ; Weston, Jared B.

  • Author_Institution
    Capitol Aggregates, San Antonio, TX, USA
  • fYear
    2014
  • fDate
    13-17 April 2014
  • Firstpage
    1
  • Lastpage
    8
  • Abstract
    The Company was left with more finish grinding capacity than the 4-stage preheater kiln could supply, emission credits set to expire in 2011 and one of the healthier cement markets in the USA after shutting down a wet kiln in 2006. A strong, successful and healthy relationship with the original equipment supplier (OEM) has allowed the Company to implement new technologies to drive the operation of the equipment throughout the 30 year history of the production line. Recently, the Company chose the OEM in undertaking a number of upgrades to achieve an increase in capacity and improved efficiency. This paper highlights the steps taken during a 2-phase upgrade to achieve 2,200 STPD (2,000 MTPD) of clinker and allow the Company to remain at the forefront in implementing new technologies in the industry.
  • Keywords
    cement industry; grinding; kilns; milling machines; 2-phase upgrade; 4-stage preheater kiln; OEM; STPD; USA; clinker; emission credits; finish grinding capacity; healthier cement markets; original equipment supplier; production line; pyro modifications; raw mill modifications; wet kiln; Companies; Cooling; Kilns; Production; Regulators; Steel;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Cement Industry Technical Conference (CIC), 2014 IEEE-IAS/PCA
  • Conference_Location
    National Harbor, MD
  • Print_ISBN
    978-1-4799-3293-1
  • Type

    conf

  • DOI
    10.1109/CITCon.2014.6820118
  • Filename
    6820118