DocumentCode
143043
Title
Pyro and raw mill modifications to achieve 2,200 STPD
Author
McKervey, Gerry ; Miller, S.W. ; Weston, Jared B.
Author_Institution
Capitol Aggregates, San Antonio, TX, USA
fYear
2014
fDate
13-17 April 2014
Firstpage
1
Lastpage
8
Abstract
The Company was left with more finish grinding capacity than the 4-stage preheater kiln could supply, emission credits set to expire in 2011 and one of the healthier cement markets in the USA after shutting down a wet kiln in 2006. A strong, successful and healthy relationship with the original equipment supplier (OEM) has allowed the Company to implement new technologies to drive the operation of the equipment throughout the 30 year history of the production line. Recently, the Company chose the OEM in undertaking a number of upgrades to achieve an increase in capacity and improved efficiency. This paper highlights the steps taken during a 2-phase upgrade to achieve 2,200 STPD (2,000 MTPD) of clinker and allow the Company to remain at the forefront in implementing new technologies in the industry.
Keywords
cement industry; grinding; kilns; milling machines; 2-phase upgrade; 4-stage preheater kiln; OEM; STPD; USA; clinker; emission credits; finish grinding capacity; healthier cement markets; original equipment supplier; production line; pyro modifications; raw mill modifications; wet kiln; Companies; Cooling; Kilns; Production; Regulators; Steel;
fLanguage
English
Publisher
ieee
Conference_Titel
Cement Industry Technical Conference (CIC), 2014 IEEE-IAS/PCA
Conference_Location
National Harbor, MD
Print_ISBN
978-1-4799-3293-1
Type
conf
DOI
10.1109/CITCon.2014.6820118
Filename
6820118
Link To Document