DocumentCode
1432089
Title
Civil-engineering works for a.c. electrification. Developments since 1960
Author
Wardle, J.B.
Author_Institution
British Railways, Chief Civil Engineer´´s Department, London Midland Region, London, UK
Volume
119
Issue
1
fYear
1972
fDate
1/1/1972 12:00:00 AM
Firstpage
69
Lastpage
73
Abstract
An account is given of the change in conditions on British Railways during the period 1960¿1970 which have required developments in methods of achieving clearances for a.c. electrification. Relatively lightweight precast reinforced-concrete arch units have been developed for erection by off-track equipment to replace many existing arch bridges. Different techniques for individual bridges are also described. Experience in running has indicated that waterproofing is a very important factor, and this, together with parapet treatments, is reviewed.
Keywords
civil engineering; railways; 1960 to 1970 modernization; AC electrification; British Railways; civil engineering; lightweight precast reinforced concrete arch units; parapet treatments; railways; waterproofing;
fLanguage
English
Journal_Title
Electrical Engineers, Proceedings of the Institution of
Publisher
iet
ISSN
0020-3270
Type
jour
DOI
10.1049/piee.1972.0010
Filename
5251425
Link To Document