DocumentCode
1432628
Title
High-voltage rectifier equipment for tube testing
Author
Durand, S. R.
Author_Institution
Allis-Chalmers Manufacturing Company, San Francisco. Calif.
Volume
69
Issue
9
fYear
1950
Firstpage
781
Lastpage
781
Abstract
MERCURY-ARC rectifier equipment of high capacity and voltage rating and special design for tube-testing service has been installed in the RCA-Victor Company Advanced Development Laboratory at Lancaster, Pa. The equipment provides 2,000 kw at 12,000 volts d-c with two rectifier units connected in parallel, and 2,000 wk at 24,000 volts d-c with the two units in series. In each case, the d-c windings of the rectifier transformers are displaced 30 electrical degrees so as to achieve, effectively, 12-phase rectification. The basic power circuit of the installation is shown in Figure 1.
Keywords
Circuit breakers; Electron tubes; Rectifiers; Regulators; Testing; Voltage control; Windings;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1950.6434048
Filename
6434048
Link To Document