DocumentCode :
1433194
Title :
Deionization time of fault-arc paths
Volume :
69
Issue :
2
fYear :
1950
Firstpage :
130
Lastpage :
130
Abstract :
AUTOMATIC RECLOSING of circuit breakers in high-voltage transmission lines can increase system transient stability limits provided reclosure can be accomplished rapidly. Minimum time of reclosure is dependent largely on the rate of dielectric recovery of the ionized fault-arc path. Data on deionization times of fault-arc paths have been obtained from tests on a 115-kv system.
Keywords :
Circuit faults; Current measurement; Dielectrics; Fault currents; Gases; Interrupters; Resistance;
fLanguage :
English
Journal_Title :
Electrical Engineering
Publisher :
ieee
ISSN :
0095-9197
Type :
jour
DOI :
10.1109/EE.1950.6434143
Filename :
6434143
Link To Document :
بازگشت