• DocumentCode
    1433330
  • Title

    Engineering time [Manufacturing Planning]

  • Author

    Wheatley, M.

  • Volume
    5
  • Issue
    1
  • fYear
    2010
  • Firstpage
    58
  • Lastpage
    59
  • Abstract
    When production lines are under pressure, time needed for process improvements is one of the first casualties. But, as Malcolm Wheatley discovers, there are ways to avoid postponing necessary downtime.
  • Keywords
    production planning; time management; downtime; engineering time; process improvement; production lines;
  • fLanguage
    English
  • Journal_Title
    Engineering & Technology
  • Publisher
    iet
  • ISSN
    1750-9637
  • Type

    jour

  • Filename
    5426551