Title :
Syncom event schedule networks — The best of PERT
Author :
Vaughan, B. W. ; Kedrowsky, G. V.
Author_Institution :
Technical Staff, Astro-Electronics Division, U. S. Army Electronics Research and Development Laboratory, Fort Monmouth, N. J.
Abstract :
The U. S. Army Electronics Research and Development Laboratory role in SYNCOM, the DOD/NASA Communications Satellite System is defined and the development and use of a unique program control system will be discussed. The reporting system with its 24-hour status response capability and a single denominator feature that provides three levels of detail for decision making purposes by various levels of management will be covered. The interrelationship of a cost accounting system, actual vs forecast with the second-level events schedule networks by areas of technical effort, components of equipment, cost categories will be discussed. The summary shows how the best of PERT concept has been achieved with a minimization of its normal complexity.
Keywords :
Antennas; Assembly; Computers; Contracts; Laboratories; Research and development; Schedules;
Journal_Title :
Engineering Management, IEEE Transactions on
DOI :
10.1109/TEM.1963.6434313