• DocumentCode
    1435174
  • Title

    Estimation of maximum demand on a British electricity-board system. Forecast periods of 1-3 years

  • Author

    Towill, S.

  • Author_Institution
    Merseyside & North Wales Electricity Board, Head Office, Chester, UK
  • Volume
    121
  • Issue
    7
  • fYear
    1974
  • fDate
    7/1/1974 12:00:00 AM
  • Firstpage
    609
  • Lastpage
    615
  • Abstract
    The paper is concerned with the forecasting of maxium demand (m.d.) on an area board (or Central Electricity Generating Board Region) system where forecast periods of 1-3 years are important for planning the amount of, and the timing of, capital expenditure. A causal model is sought that gives a good fit to the historical data of recorded m.d. and a satisfactory performance in prediction. The primary parameters in the causal model were found to be the gross domestic product (g.d.p.), temperature and load factor. The system maximum demand (m.d.) is forecast for average-cold-spell (a.c.s.) conditions with variances due to: (a) standard deviation (s.d.) of model estimating errors (b) s.d. of the National Institute estimating errors for g.d.p. (c) s.d. of departure of temperature for a.c.s. conditions The mathematical formulation of the problem enables an estimate to be given, with a precise probability, of a given load being exceeded under any assumed set of adverse conditions. The principle that the system m.d. can be estimated from a limited number of parameters can be judged by the performance and precision of the model. The model gives a very good fit to historical data. The standard error (s.e.) is of the order of 0.6% of recorded m.d. The parameters were shown to be well chosen by their high mathematical significance, and the performance of the model in the 1973 prediction was consistent with its performance on the historical data. Confidence in the performance of the model, in prediction, was strengthened by a retrospective examination of the predictive performance of the chosen model when based on earlier data.
  • Keywords
    modelling; power systems; technological forecasting; capital expenditure; maximum demand estimation; modelling; planning; power systems; technological forecasting; timing;
  • fLanguage
    English
  • Journal_Title
    Electrical Engineers, Proceedings of the Institution of
  • Publisher
    iet
  • ISSN
    0020-3270
  • Type

    jour

  • DOI
    10.1049/piee.1974.0142
  • Filename
    5251932