DocumentCode
1435528
Title
The modern A-C network calculator
Author
Parker, W. W.
Author_Institution
Westinghouse Electric and Manufacturing Company, East Pittsburgh, Pa.
Volume
60
Issue
11
fYear
1941
Firstpage
977
Lastpage
982
Abstract
PRODUCTION requires power. The urgent necessity of meeting the immediate demands for electric power — due to national defense and natural growth — has created a challenge to the planning engineers. Local loads are increased and additional loads established, resulting in shifting of load centers. Such changes require increased generating and transmitting facilities. To provide for this expansion in power supply requires accurate planning to avoid waste of time, materials, or effort. The first step is the quick solution of all the electrical problems. The A-C. network calculator provides accurate means for solving these problems. Therefore, it is appropriate to present the newly perfected features of the latest A.C. network calculators. These provide the means and methods for faster and more accurate analysis of existing or planned power systems and the solutions of electrical design and operating problems. The essential elements of a power system are reproduced in miniature replica, as illustrated pictorially in figure 1 for a simple radial feed from generator to load. The calculator reproduces systems with many generators or generating stations, transformers, lines, and loads. Readings of the miniature network on the calculator are readily converted into actual system quantities.
Keywords
Calculators; Generators; Inductors; Instruments; Regulators; Resistance; Voltage control;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1941.6434538
Filename
6434538
Link To Document