Title :
Electrical demand due to on/off thermostatically controlled loads
Author :
Murgatroyd, J.L.
Author_Institution :
University of Aston, Department of Electrical Engineering, Birmingham, UK
Volume :
119
Issue :
7
fYear :
1972
fDate :
7/1/1972 12:00:00 AM
Firstpage :
915
Lastpage :
920
Abstract :
The integrated demand due to a group of similar on/off loads, each switched by thermostat, e.g. electric space heaters, is obtained as a function of the load-cycle time and the electricity authority´s registration period. Staggered switching from the cold-start condition must be adopted so that the maximum demand is determined by the steady-state cycling conditions. Subsequent demand perturbations due to failure of individual processes may be insignificant, although demand control will be necessary for the introduction of large blocks of power to the load. The variance of the demand may be decreased by a reduction of the cycle time, thus leading to closer demand control, and hence to economies in the maximum-demand tariff.
Keywords :
load dispatching; load regulation; on-off control; power system control; power systems; cycle time; demand control; demand perturbations; electric space heaters; load cycle; staggered switching; thermostat;
fLanguage :
English
Journal_Title :
Electrical Engineers, Proceedings of the Institution of
Publisher :
iet
ISSN :
0020-3270
Type :
jour
DOI :
10.1049/piee.1972.0194
Filename :
5251994
Link To Document :
بازگشت