Title :
Electric distribution systems in buildings
Author_Institution :
Keller-Pike Company, Philadelphia, Pa.
fDate :
3/1/1940 12:00:00 AM
Abstract :
Increased intensity of illumination and the upward trend in industrial power requirements have loaded the electric distribution systems in many buildings beyond their rated capacities, requiring many extensive rewiring jobs that could have been avoided by the provision of adequate reserve capacity in the original installation. It is pointed out here that even though no material increase in load results after a number of years, a system having more than the capacity required by code rules is economical.
Keywords :
Buildings; Conductors; Energy loss; Induction motors; Lighting; Voltage control; Wires;
Journal_Title :
Electrical Engineering
DOI :
10.1109/EE.1940.6434806