• DocumentCode
    1438944
  • Title

    Restoration of service from large metropolitan system after complete shutdown

  • Author

    Dryar, H. A. ; Bailey, Raymond

  • Author_Institution
    Philadelphia Electric Company, Philadelphia, Pa.
  • Volume
    59
  • Issue
    10
  • fYear
    1940
  • Firstpage
    571
  • Lastpage
    574
  • Abstract
    This paper sets forth briefly two general procedures that may be followed in starting the system of the Philadelphia Electric Company after a complete shutdown, and also gives some experiences relating to re-establishing service. There is also included an outline of some of the major principles of design followed in the development of the system which are important in minimizing the chance of a complete system shutdown and in facilitating restoration of service in the event of a complete outage.
  • Keywords
    Boilers; Circuit faults; Companies; Integrated circuit interconnections; Layout; Substations; Switches;
  • fLanguage
    English
  • Journal_Title
    Electrical Engineering
  • Publisher
    ieee
  • ISSN
    0095-9197
  • Type

    jour

  • DOI
    10.1109/EE.1940.6435134
  • Filename
    6435134