DocumentCode
1438944
Title
Restoration of service from large metropolitan system after complete shutdown
Author
Dryar, H. A. ; Bailey, Raymond
Author_Institution
Philadelphia Electric Company, Philadelphia, Pa.
Volume
59
Issue
10
fYear
1940
Firstpage
571
Lastpage
574
Abstract
This paper sets forth briefly two general procedures that may be followed in starting the system of the Philadelphia Electric Company after a complete shutdown, and also gives some experiences relating to re-establishing service. There is also included an outline of some of the major principles of design followed in the development of the system which are important in minimizing the chance of a complete system shutdown and in facilitating restoration of service in the event of a complete outage.
Keywords
Boilers; Circuit faults; Companies; Integrated circuit interconnections; Layout; Substations; Switches;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1940.6435134
Filename
6435134
Link To Document