DocumentCode
1440676
Title
Scheduling Wafer Lots on Diffusion Machines in a Semiconductor Wafer Fabrication Facility
Author
Kim, Yeong-Dae ; Joo, Byung-Jun ; Choi, So-Young
Author_Institution
Dept. of Ind. Eng., Korea Adv. Inst. of Sci. & Technol., Daejeon, South Korea
Volume
23
Issue
2
fYear
2010
fDate
5/1/2010 12:00:00 AM
Firstpage
246
Lastpage
254
Abstract
This paper focuses on the problem of scheduling wafer lots on diffusion workstations in a semiconductor wafer fabrication facility. In a diffusion workstation, there are multiple identical machines, and each of them can process a (limited) number of wafer lots at a time. Wafer lots can be classified into several product families, and wafer lots that belong to the same product family can be processed together as a batch. Processing times and setup times for wafer lots of the same product family are the same, but ready times of the wafer lots (at the diffusion workstation) may be different. We present several heuristic algorithms for the problem with the objective of minimizing total tardiness. For evaluation of performance of the suggested algorithms, a series of computational experiments is performed on randomly generated test problems. Results show that the suggested algorithms perform better than algorithms currently used in practice.
Keywords
scheduling; semiconductor device manufacture; diffusion machine; heuristic algorithm; semiconductor wafer fabrication facility; wafer lots scheduling; Diffusion; heuristics; scheduling; tardiness; wafer fabrication;
fLanguage
English
Journal_Title
Semiconductor Manufacturing, IEEE Transactions on
Publisher
ieee
ISSN
0894-6507
Type
jour
DOI
10.1109/TSM.2010.2045666
Filename
5430981
Link To Document