DocumentCode :
1440946
Title :
Emergency overloading of air-cooled oil-immersed power transformers by hot-spot temperatures
Author :
Montsinger, V. M. ; Ketchum, P. M.
Author_Institution :
General Electric Company, Pittsfield, Mass.
Volume :
61
Issue :
12
fYear :
1942
Firstpage :
906
Lastpage :
915
Abstract :
The paper points out that during the period of the war the need for obtaining maximum transformer overload capacity is very great, particularly under rare emergency conditions. From a thermal standpoint, the amount of overload is limited by the hottest spot in the transformer winding. To obtain accurate data 1. On the actual hot-spot temperature s under rated load conditions 2. On the increase of the hot spot with load under both ultimate moderate overload and heavy short-time overload conditions
Keywords :
Coils; Cooling; Heating; Oil insulation; Power transformer insulation; Windings;
fLanguage :
English
Journal_Title :
Electrical Engineering
Publisher :
ieee
ISSN :
0095-9197
Type :
jour
DOI :
10.1109/EE.1942.6435475
Filename :
6435475
Link To Document :
بازگشت