    Kilowatts, kilovars, and system investments

  • Author

    Butler, J. W.

  • Author_Institution
    General Electric Company, Schenectady, N. Y.
  • Volume
    62
  • Issue
    3
  • fYear
    1943
  • fDate
    3/1/1943 12:00:00 AM
  • Firstpage
    133
  • Lastpage
    137
  • Abstract
    WHAT portion of the total system investment can one equitably allocate to the system kilovar requirements? Or, looking at it in a little different way, what portion of the system kilowatt capacity is used by kilovars ? The answer to these questions obviously depends upon the method of supplying the kilovars. It is indicated in this analysis that supplying the kilovar requirements of a system in general may be divorced from supplying the kilowatt requirements and that the two factors may be dealt with as independent commodities. This approach shows that maximum usage of system capacity is made in producing kilowatts.
  • Keywords
    Capacitors; Companies; Generators; Investments; Limiting; Reactive power; System analysis and design;
  • fLanguage
    English
  • Journal_Title
    Electrical Engineering
  • Publisher
    ieee
  • ISSN
    0095-9197
  • Type

    jour

  • DOI
    10.1109/EE.1943.6435653
  • Filename
    6435653