DocumentCode :
1443646
Title :
Interim report on emergency overloads on overhead conductors: AIEE working group on towers, poles, and conductors
Volume :
62
Issue :
9
fYear :
1943
Firstpage :
588
Lastpage :
590
Abstract :
The present war emergency requires that the maximum use be made of existing equipment and systems and that a minimum of critical material be used for new equipment. This publication, and other guides and reports in this series, have been prepared for the information of users during the war emergency. Upon termination of the war emergency they will be reconsidered by the standards committee and the committees which prepared them, and will be approved, revised for normal use, or rescinded. This procedure is being followed in preference to the preparation of special emergency standards which might involve redesigning and drastic changes in manufacturing practices. These guides will accomplish the maximum conservation of critical materials, since they provide for the maximum use of existing equipment and systems, as well as new equipment without changing the fundamental basis on which the present standards have been prepared.
Keywords :
Aluminum; Annealing; Clamps; Conductors; Copper; Heating; Wires;
fLanguage :
English
Journal_Title :
Electrical Engineering
Publisher :
ieee
ISSN :
0095-9197
Type :
jour
DOI :
10.1109/EE.1943.6435922
Filename :
6435922
Link To Document :
بازگشت