• DocumentCode
    1443804
  • Title

    Interim report on overloading current-limiting reactors: AIEE transformer subcommittee

  • Volume
    62
  • Issue
    10
  • fYear
    1943
  • Firstpage
    611
  • Lastpage
    612
  • Abstract
    The present war emergency requires that the maximum use be made of existing equipment and systems and that a minimum of critical material be used for new equipment. This publication, as well as other guides and reports in this series, has been prepared for the information of users during the war emergency. Upon termination of the war emergency, they will be reconsidered by the Standards committee and the committees that prepared them, and will be approved, revised for normal use, or rescinded. This procedure is being followed in preference to the preparation of special emergency Standards which might involve redesigning and drastic changes in manufacturing practices. These guides will accomplish the maximum conservation of critical materials, since they provide for the maximum use of existing equipment and systems, as well as new equipment, without changing the fundamental basis on which the present Standards have been prepared.
  • Keywords
    Cooling; Inductors; Loading; Oil insulation; Power transformer insulation; Standards;
  • fLanguage
    English
  • Journal_Title
    Electrical Engineering
  • Publisher
    ieee
  • ISSN
    0095-9197
  • Type

    jour

  • DOI
    10.1109/EE.1943.6435950
  • Filename
    6435950