DocumentCode :
1444241
Title :
WPB and WMC co-ordinate production needs and man-power resources
Volume :
62
Issue :
12
fYear :
1943
Firstpage :
558
Lastpage :
558
Abstract :
A basic “urgency” plan to integrate production needs with man-power resources wherever and whenever conditions of urgency may develop any place in the United States have been announced by the War Production Board and the War Manpower Commission.
Keywords :
Educational institutions; Machinery; Maintenance engineering; Manufacturing; Marine vehicles; Production; TV;
fLanguage :
English
Journal_Title :
Electrical Engineering
Publisher :
ieee
ISSN :
0095-9197
Type :
jour
DOI :
10.1109/EE.1943.6436028
Filename :
6436028
Link To Document :
بازگشت