• DocumentCode
    1444562
  • Title

    Interim report on emergency overloads on overhead conductors

  • Volume
    62
  • Issue
    12
  • fYear
    1943
  • Firstpage
    940
  • Lastpage
    940
  • Abstract
    Discussion of paper 43–105 by the AIEE working group on towers, poles, and conductors of the transmission subcommittee of the AIEE committee on power transmission and distribution, presented at the Cleveland national technical meeting, Cleveland, Ohio, June 21–25, 1943, and published in AIEE TRANSACTIONS, 1943, September section, pages 588–90.
  • Keywords
    Clamps; Conductors; Copper; Corona; Couplings; Temperature measurement; Wires;
  • fLanguage
    English
  • Journal_Title
    Electrical Engineering
  • Publisher
    ieee
  • ISSN
    0095-9197
  • Type

    jour

  • DOI
    10.1109/EE.1943.6436086
  • Filename
    6436086