DocumentCode
1447079
Title
Electrical features of design and operation of the plantation pipe line
Author
Hyde, M. A. ; Britton, H. B.
Author_Institution
Westinghouse Electric and Manufacturing Company, East Pittsburgh, Pa.
Volume
61
Issue
9
fYear
1942
Firstpage
638
Lastpage
644
Abstract
PLANTATION Pipe Line Company´s new 1,254-mile pipe line system is the largest ever built for the handling of refined petroleum products and is the largest all-electric-powered pipe line in existence. First full-length delivery was made early in February 1942, and immediately the line became an important factor in the transportation of gasoline and fuel oils to a large area in the southeastern states. Compared to the usual pipe line, this system operates under highly exacting conditions, and in its design the electrical and associated control features are of prime importance. The major electrification problems were:
Keywords
Atmosphere; Discharges (electric); Inductors; Lighting; Petroleum; Switchgear;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1942.6436520
Filename
6436520
Link To Document