Title :
Routine insulation testing of synchronous machines
Author :
Hunt, L. F. ; Vivian, J. H.
Author_Institution :
Southern California Edison Company, Log Angeles, Calif.
fDate :
6/1/1951 12:00:00 AM
Abstract :
THE CONTINUOUS operation of large synchronous machines and freedom from failures in service is of vital interest to every electric utility company. One of the major causes of unpredicted and unscheduled outage is the failure of stator coil insulation.
Keywords :
Breakdown voltage; Inspection; Insulation; Synchronous machines; Testing; Voltage control; Windings;
Journal_Title :
Electrical Engineering
DOI :
10.1109/EE.1951.6436638