Title :
Incorporating Large-Scale Distant Wind Farms in Probabilistic Transmission Expansion Planning—Part II: Case Studies
Author :
Moeini-Aghtaie, Moein ; Abbaspour, Ali ; Fotuhi-Firuzabad, Mahmud
Author_Institution :
Dept. of Electr. Eng., Sharif Univ. of Technol., Tehran, Iran
Abstract :
This paper is the second part of a two-paper set which comprehensively sets forth an innovative approach in transmission grid reinforcement studies in the presence of wind energy. Part I thoroughly defined the theory and algorithms. Here, to trace the feasibility of the proposed algorithm, three different case studies are implemented on the 24-Bus IEEE Reliability Test System (IEEE-RTS). The optimal solutions in Pareto fronts of different cases are reached, analyzed, and the final solution (optimal plan) of each case is obtained using the fuzzy decision making method. Moreover, in order to analyze the effects of variations in the large-scale wind farm generation on the transmission expansion planning (TEP) studies, the methodology is applied to the Iran 400-kV transmission grid. Two different generation expansion strategies are considered to investigate the impacts of various renewable energy policies on the TEP results. The wind energy-imposed costs of these two strategies are addressed, discussed, and compared to introduce some recommendations for wind integration policies.
Keywords :
IEEE standards; Pareto optimisation; decision making; fuzzy set theory; government policies; power generation planning; power generation reliability; power grids; power transmission planning; power transmission reliability; probability; renewable energy sources; wind power plants; 24-bus IEEE reliability test system; 24-bus IEEE-RTS; Iran transmission grid; Pareto front optimal solution; fuzzy decision making method; generation expansion strategy; large-scale distant wind farm generation; probabilistic TEP; probabilistic transmission expansion planning; renewable energy policy; transmission grid reinforcement study; voltage 400 kV; wind energy-imposed cost; wind integration policy; Computer aided software engineering; Investments; Planning; Power transmission lines; Wind energy; Wind farms; Wind speed; IEEE-RTS; Non-Dominated Sorting Genetic Algorithm II (NSGA II); Point Estimation Method (PEM); transmission expansion planning (TEP); wind farm;
Journal_Title :
Power Systems, IEEE Transactions on
DOI :
10.1109/TPWRS.2011.2182364