DocumentCode :
1448334
Title :
Systematization of tube surveillance in large scale computers
Author :
Spence, H. W.
Author_Institution :
Ballistic Research Laboratories, Aberdeen Proving Ground Md.
Volume :
70
Issue :
7
fYear :
1951
fDate :
7/1/1951 12:00:00 AM
Firstpage :
605
Lastpage :
608
Abstract :
Ninety per cent of the service interruptions of ENIAC at Aberdeen Proving Ground are caused by vacuum-tube failures. A 5-month tube surveillance program was conducted wherein faulty tubes were detected and replaced. How such tubes were tested and their histories gathered is described together with the preliminary findings.
Keywords :
Computers; Current measurement; Electron tubes; Resistance heating; Standards; Surveillance; Voltage measurement;
fLanguage :
English
Journal_Title :
Electrical Engineering
Publisher :
ieee
ISSN :
0095-9197
Type :
jour
DOI :
10.1109/EE.1951.6436708
Filename :
6436708
Link To Document :
بازگشت