Title :
Systematization of tube surveillance in large scale computers
Author_Institution :
Ballistic Research Laboratories, Aberdeen Proving Ground Md.
fDate :
7/1/1951 12:00:00 AM
Abstract :
Ninety per cent of the service interruptions of ENIAC at Aberdeen Proving Ground are caused by vacuum-tube failures. A 5-month tube surveillance program was conducted wherein faulty tubes were detected and replaced. How such tubes were tested and their histories gathered is described together with the preliminary findings.
Keywords :
Computers; Current measurement; Electron tubes; Resistance heating; Standards; Surveillance; Voltage measurement;
Journal_Title :
Electrical Engineering
DOI :
10.1109/EE.1951.6436708