DocumentCode
1449013
Title
Telemetering systems and channels for a large interconnected power system
Author
Duff, C. K.
Author_Institution
Hydro-Electric Power Commission of Ontario, Toronto, Ontario, Canada
Volume
70
Issue
9
fYear
1951
Firstpage
796
Lastpage
801
Abstract
Telemetering serves many and varied purposes in the co-ordination of a large power system. This article describes some typical applications as they are used in one Canadian system.
Keywords
Potentiometers; Power measurement; Power systems; Rivers; Transmitters; Voltage measurement; Wires;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1951.6436815
Filename
6436815
Link To Document