DocumentCode
1449969
Title
Adjustable-voltage control handles 250-ton crane loads at mcnary dam
Volume
70
Issue
12
fYear
1951
Firstpage
1038
Lastpage
1038
Abstract
Crane controls so sensitive they can regulate the movement of a 250-ton load to within 1/32 inch were tested recently at McNary Dam by the United States Army Corps of Engineers. McNary Dam is located on the Columbia River near Umatilla. Oreg. Developed by the Westinghouse Electric Corporation, the new adjustable-voltage control has been installed on the first of two 200-ton gantrycranes built by the Judson Pacific-Murphy Corporation, Emeryville, Calif. These cranes will be used to raise and lower the 126-ton spillway gates at the dam as shown in the picture. When a gate is raised, the load on the crane approaches twice the weight of the gate, because of the downward pressure of the water rushing under it. Each crane is 60 feet long, 42 feet wide, and towers 77 feet above the top of the dam. Mounted on 16 wheels, the giant cranes move along the top of the dam on rails placed 34 feet apart.
Keywords
Cranes; DC motors; Educational institutions; Industries; Logic gates; Organizations; Torque;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1951.6436968
Filename
6436968
Link To Document