DocumentCode
1450347
Title
Ignitron converters for high-energy accelerators
Author
Boyer, J. L. ; Marcum, C. R.
Author_Institution
Westinghouse Electric Corporation, East Pittsburgh, Pa.
Volume
69
Issue
10
fYear
1950
Firstpage
871
Lastpage
871
Abstract
A LARGE proton-synchrotron (bevatron) requires the magnet current to build up rather slowly to a maximum value. To save the energy stored in the magnetic field and restart the cycle in a short time, the magnet current must be forced to zero by a counter voltage. The acceleration of particles is accomplished in the current build-up period, and this is the most critical portion of the load cycle.
Keywords
Assembly; Flywheels; Generators; Laboratories; Magnetic devices; Power supplies; Rectifiers;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1950.6437027
Filename
6437027
Link To Document