• DocumentCode
    1453960
  • Title

    A practical maintenance scheduling program mathematical model and case study

  • Author

    Chattopadhyay, Debabrata

  • Author_Institution
    KGM Power Technol. Inc., New Dehli, India
  • Volume
    13
  • Issue
    4
  • fYear
    1998
  • fDate
    11/1/1998 12:00:00 AM
  • Firstpage
    1475
  • Lastpage
    1480
  • Abstract
    This paper presents an improved power system maintenance scheduling methodology employing linear programming. It marks significant improvement over the integer programming-based maintenance scheduling algorithms both in terms of computation time and reliability of convergence. Apart from this, it also provides better means to model the period of maintenance by precise starting and ending days, special restrictions on maintenance and variance of expected unserved energy across the months of the planning period. A case study for the Northern Regional Electricity Board System of India with 238 generating units is carried out using the program
  • Keywords
    electricity supply industry; linear programming; maintenance engineering; power system planning; scheduling; India; case study; computation time; convergence reliability; electric utilities; expected unserved energy; linear programming; mathematical model; planning period; power system maintenance scheduling methodology; Computer aided software engineering; Cost function; Linear programming; Maintenance; Mathematical model; Power system interconnection; Power system modeling; Power system reliability; Processor scheduling; Scheduling algorithm;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/59.736293
  • Filename
    736293