DocumentCode :
1456302
Title :
Electronic elevator supervisor in new building fills heavy traffic demands
Volume :
71
Issue :
3
fYear :
1952
fDate :
3/1/1952 12:00:00 AM
Firstpage :
299
Lastpage :
300
Abstract :
Elevators so controlled electronically that greater service is available to meet heavy traffic demands have been installed in the new 32-story, air-conditioned Chrysler Building East, New York City, N. Y., which wasopened in November 1951.
Keywords :
Electric potential; Electron tubes; Elevators; Materials; NIST; Springs;
fLanguage :
English
Journal_Title :
Electrical Engineering
Publisher :
ieee
ISSN :
0095-9197
Type :
jour
DOI :
10.1109/EE.1952.6438034
Filename :
6438034
Link To Document :
بازگشت