Title :
Generator winding design-Amos 3 with 25 years experience
Author :
Oliver, Jim ; Michalec, Jim ; Zimmerli, Beat ; Joho, R. ; Krick, N. ; Huber, A.
Volume :
16
Issue :
1
fYear :
2001
fDate :
3/1/2001 12:00:00 AM
Firstpage :
87
Lastpage :
91
Abstract :
Over 25 years ago, American Electric Power (AEP) purchased for the John E. Amos Plant Unit 3, the first of six new 1300 MW units. With a highly coordinated effort utilizing AEPs operating experience and the manufacturer´s design and manufacturing capability, extraordinarily reliable generators were produced which have run for all these years with very little trouble. This paper shows the advantages to be achieved by careful consideration of all aspects of stator winding design in large powerful turbine generators: conductors, wedging, and end winding support
Keywords :
reliability; stators; turbogenerators; 1300 MW; 25 y; American Electric Power; John E. Amos Plant Unit 3; conductors; end winding support; generator winding design; operating experience; reliability; stator winding design; turbine generator; wedging; Conductors; Cooling; Copper; Manufacturing; Power generation; Solids; Stator cores; Stator windings; Steel; Turbines;
fLanguage :
English
Journal_Title :
Energy Conversion, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8969
Type :
jour
DOI :
10.1109/60.911409
Filename :
911409
Link To Document :
بازگشت