Abstract
In today´s electric power systems, generation relies almost exclusively on many AC generating units operating in parallel. When a new generating unit is being connected to the system, a variety of conditions must be precisely satisfied, including the amplitude, frequency, and phase conditions. This article describes a new method for establishing the advance time, which is the most important parameter of an automatic generator synchronizer, and focuses on computer simulations used to test the results
Keywords
AC generators; machine control; machine testing; synchronisation; AC generating units; advance time establishment; amplitude conditions; automatic generator synchronizer; frequency conditions; phase conditions; power systems; setting; testing; Automatic testing; Circuit breakers; Circuit simulation; Circuit testing; Frequency synchronization; Power system dynamics; Power system reliability; Switching circuits; Time measurement; Voltage;
fLanguage
English
Journal_Title
Computer Applications in Power, IEEE
Publisher
ieee
ISSN
0895-0156
Type
jour
DOI
10.1109/67.738317
Filename
738317
Link To Document