Title :
Impact of the atomic energy program on the electrical industry
Author_Institution :
Electric Power Branch, Division of Construction and Supply, U. S. Atomic Energy Commission, Washington, D. C.
fDate :
7/1/1954 12:00:00 AM
Abstract :
Starting with a power requirement of 225 megawatts at Oak Ridge during the war, the Atomic Energy Commission´s demands on the suppliers of power will be approximately 6,500 megawatts. How the problems raised by these unprecedented demands are being solved is a tribute to American engineering talents.
Keywords :
Companies; Contracts; Electrical engineering; Fuels; Investments; Power supplies;
Journal_Title :
Electrical Engineering
DOI :
10.1109/EE.1954.6438861