Abstract :
As EDF is experiencing increasing difficulties in developing its transmission network, the time may have come to reconsider the projects selection method. In this paper, the authors point out that the currently used method essentially relies on a classical discounted balance criterion. They then present a new method which takes into account the impact of a project on the environment, by considering an environmental risk which may jeopardize the project´s success. This method helps to evaluate the probability that each possible route of each project will be carried through. A simple probability computation then allows the derivation of a global comparison of the eligible projects on the basis of an expected discounted balance criterion. Experiments now in progress will help to decide upon this method´s efficiency in the context of its operational use
Keywords :
electricity supply industry; environmental factors; power system planning; power transmission; probability; project engineering; transmission network calculations; transmission networks; EDF; EHV transmission network planning; France; environmental constraints; environmental risk; expected discounted balance criterion; probability computation; projects selection method; Context; Costs; Decision making; Density estimation robust algorithm; Intelligent networks; Power system interconnection; Power system planning; Power transmission lines; Rail transportation; Voltage;
fLanguage :
English
Journal_Title :
Power Delivery, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8977
Type :
jour
DOI :
10.1109/61.544274
Filename :
544274
Link To Document :
بازگشت