DocumentCode
1465590
Title
Power system: Arnold engineering development center
Author
Goodman, D. J.
Author_Institution
Aro, Inc., Tullahoma, Tenn.
Volume
74
Issue
9
fYear
1955
Firstpage
771
Lastpage
774
Abstract
The electric distribution system described began operation in October 1952. As designed and built, it has given every indication of its ability to fulfill its requirements and also of being capable of modification as conditions change.
Keywords
Buildings; Cable TV; Power cables; Power control; Substations; Test facilities;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1955.6439545
Filename
6439545
Link To Document