Abstract :
This paper examines the changes in working practices resulting from the introduction of an information technology (IT) project. The data are drawn from the experience gained through operating the EPIC (Electronic Parts Information Centre) system at RSRE on behalf of the MOD, Directorate of Components Values and Devices. Details of this system were described in a previous paper in this Journal.1 The conclusions drawn at the end of that paper are examined and judged.