• DocumentCode
    1467174
  • Title

    Updating the control and instrumentation systems on an operational nuclear power station

  • Author

    Unsworth, C.F.

  • Volume
    57
  • Issue
    4
  • fYear
    1987
  • Firstpage
    156
  • Lastpage
    160
  • Abstract
    The problems of and the procedures for planning the replacement of the control and instrumentation equipment on an operational nuclear power station are outlined. The major refurbishments carried out at the Hinkley Point `A¿ station are described. These include replacement of the burst can etection and reactor temperature monitoring equipment, turbine instrumentation, boiler drum level control and stack monitoring equipment.
  • Keywords
    level control; nuclear power stations; power station control; Hinkley Point; boiler drum level control; burst can detection; control; instrumentation; operational nuclear power station; reactor temperature monitoring; stack monitoring; turbine instrumentation;
  • fLanguage
    English
  • Journal_Title
    Electronic and Radio Engineers, Journal of the Institution of
  • Publisher
    iet
  • ISSN
    0267-1689
  • Type

    jour

  • DOI
    10.1049/jiere.1987.0057
  • Filename
    5261670