DocumentCode :
1468742
Title :
Power system operating cost and committed generation capacity planning
Author :
Nahman, J. ; Bulatovic, S.
Author_Institution :
Fac. of Electr. Eng., Belgrade Univ., Serbia
Volume :
11
Issue :
4
fYear :
1996
fDate :
11/1/1996 12:00:00 AM
Firstpage :
1724
Lastpage :
1729
Abstract :
A realistic simulation model is presented for the evaluation of generating units variable cost and the cost of undelivered energy, taking into account existing limitations and uncertainties. A criterion for committed capacity reserve planning is also suggested, aimed at minimizing the total power system operating cost. The model and the committed capacity reserve planning criterion are applied to the IEEE RTS, for demonstration purposes
Keywords :
costing; economics; hydrothermal power systems; power system analysis computing; power system planning; IEEE RTS; committed capacity reserve planning criterion; committed generation capacity planning; computer simulation; economic modelling; generating units variable cost; hydro-thermal power networks; limitations; power system operating cost; uncertainties; undelivered energy cost; Analytical models; Capacity planning; Costs; Discrete event simulation; Meeting planning; Power generation; Power system modeling; Power system planning; Power system simulation; Uncertainty;
fLanguage :
English
Journal_Title :
Power Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8950
Type :
jour
DOI :
10.1109/59.544634
Filename :
544634
Link To Document :
بازگشت