DocumentCode :
1469723
Title :
First-Year Performance of a 20-MW _{\\rm ac} PV Power Plant
Author :
Panchula, A. F. ; Hayes, W. ; Kimber, A.
Author_Institution :
First Solar , Oakland, USA
Volume :
2
Issue :
3
fYear :
2012
fDate :
7/1/2012 12:00:00 AM
Firstpage :
359
Lastpage :
363
Abstract :
After one year of continuous operation in Ontario, Canada, the measured performance of the Sarnia 20-MW _{\\rm ac} power plant can be compared with both the long-term energy prediction and the expected energy for the operating year 2010. Based on the first-year\´s data at Enbridge\´s Sarnia 20-MW _{\\rm ac} power plant, the power plant is operating 2.1% above the long-term prediction, which is well within the expected error bars of the measurements. Estimation of the modeling error not only shows that there is no single driver of the overall modeling error during normal operation but shows that improvements are possible as well.
Keywords :
Performance evaluation; Photovoltaic systems; Power engineering and energy; Power generation; Solar power generation; Photovoltaic systems; power engineering and energy; power generation; solar power generation;
fLanguage :
English
Journal_Title :
Photovoltaics, IEEE Journal of
Publisher :
ieee
ISSN :
2156-3381
Type :
jour
DOI :
10.1109/JPHOTOV.2012.2185783
Filename :
6169942
Link To Document :
بازگشت