• DocumentCode
    1473641
  • Title

    Supervisory control for New Chicago subway

  • Author

    Derr, W. A. ; Buck, C. J. ; Stoos, J. A.

  • Author_Institution
    W. A. DERR is design engineer, switchboard engineering department, Westinghouse Electric and Manufacturing Company, East Pittsburgh, Pa.
  • Volume
    64
  • Issue
    1
  • fYear
    1945
  • Firstpage
    10
  • Lastpage
    15
  • Abstract
    THE FIRST SECTION of the long-planned Chicago subway was opened to the public October 17, 1943. The section of subway which now is in daily operation extends along State Street and is 4.9 miles in length. This is but the first step in a program which ultimately may comprise as much as 50 miles of subway in the city of Chicago.
  • Keywords
    Batteries; Dispatching; Fans; Relays; Supervisory control; Switches; Wires;
  • fLanguage
    English
  • Journal_Title
    Electrical Engineering
  • Publisher
    ieee
  • ISSN
    0095-9197
  • Type

    jour

  • DOI
    10.1109/EE.1945.6440836
  • Filename
    6440836