DocumentCode :
1473641
Title :
Supervisory control for New Chicago subway
Author :
Derr, W. A. ; Buck, C. J. ; Stoos, J. A.
Author_Institution :
W. A. DERR is design engineer, switchboard engineering department, Westinghouse Electric and Manufacturing Company, East Pittsburgh, Pa.
Volume :
64
Issue :
1
fYear :
1945
Firstpage :
10
Lastpage :
15
Abstract :
THE FIRST SECTION of the long-planned Chicago subway was opened to the public October 17, 1943. The section of subway which now is in daily operation extends along State Street and is 4.9 miles in length. This is but the first step in a program which ultimately may comprise as much as 50 miles of subway in the city of Chicago.
Keywords :
Batteries; Dispatching; Fans; Relays; Supervisory control; Switches; Wires;
fLanguage :
English
Journal_Title :
Electrical Engineering
Publisher :
ieee
ISSN :
0095-9197
Type :
jour
DOI :
10.1109/EE.1945.6440836
Filename :
6440836
Link To Document :
بازگشت