DocumentCode
1473641
Title
Supervisory control for New Chicago subway
Author
Derr, W. A. ; Buck, C. J. ; Stoos, J. A.
Author_Institution
W. A. DERR is design engineer, switchboard engineering department, Westinghouse Electric and Manufacturing Company, East Pittsburgh, Pa.
Volume
64
Issue
1
fYear
1945
Firstpage
10
Lastpage
15
Abstract
THE FIRST SECTION of the long-planned Chicago subway was opened to the public October 17, 1943. The section of subway which now is in daily operation extends along State Street and is 4.9 miles in length. This is but the first step in a program which ultimately may comprise as much as 50 miles of subway in the city of Chicago.
Keywords
Batteries; Dispatching; Fans; Relays; Supervisory control; Switches; Wires;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1945.6440836
Filename
6440836
Link To Document