DocumentCode
1474118
Title
Design for production
Author
Wassell, H.J.H.
Volume
34
Issue
6
fYear
1967
fDate
12/1/1967 12:00:00 AM
Firstpage
369
Lastpage
383
Abstract
This paper underlines the designer´s personal responsibility for his design, and the need for him to establish a good working relationship with many experts. It suggests that modern electronic design is dominated by complex production processes and integrated assemblies, and reviews the implications of this on the design task. It urges the designer to become familiar with the engineering implications of elemental assembly operations, and tailor his design to suit the particular degree of automation existing in his factory. The integrated nature of equipment assembly and testing is considered and a distinction specifically made between design proving and production testing. Some factors affecting the length of time taken for design are discussed, and the specification of Quality is considered. Production training policy for designers is outlined and the need to integrate design and production engineering is emphasized. The various aspects of a designer´s Code of Practice for the part of his task that is concerned with production are brought out in the course of the paper and summarized in Appendix 2.
Keywords
electronic equipment; production;
fLanguage
English
Journal_Title
Radio and Electronic Engineer
Publisher
iet
ISSN
0033-7722
Type
jour
DOI
10.1049/ree.1967.0105
Filename
5267095
Link To Document