• DocumentCode
    1474447
  • Title

    TheUK-3satellite and its ground check-out equipment

  • Author

    Campbell, F.P.

  • Volume
    33
  • Issue
    2
  • fYear
    1967
  • fDate
    5/20/1905 12:00:00 AM
  • Firstpage
    129
  • Lastpage
    141
  • Abstract
    An outline of the electrical design of the UK-3satellite is followed by a statement of the philosophy governing the design of the ground check-out equipment. The principal functions of the latter are described under the general headings of: (1) Test equipment for use close to the satellite. (2) The trailer-mounted data processing and recording station. Among the units specially developed for UK-3, and described, are a 365-day clock and commutator unit employing integrated circuits, and a self-checking off-limit detector.
  • Keywords
    artificial satellites; satellite communication;
  • fLanguage
    English
  • Journal_Title
    Radio and Electronic Engineer
  • Publisher
    iet
  • ISSN
    0033-7722
  • Type

    jour

  • DOI
    10.1049/ree.1967.0019
  • Filename
    5267153