Title :
The riverside generating station
Author :
Fallon, G. P. ; Quarles, F. W.
Author_Institution :
Consolidated Gas Electric Light and Power Company of Baltimore, Baltimore, Md.
Abstract :
As a result of increasing load growth in the Baltimore area, the Consolidated Gas Electric Light and Power Company of Baltimore has installed 205,000 kw of new capacity since 1940. The first 60,000-kw unit at Riverside Generating Station was and the second, on April 26, 1944. The two-unit installation is the initial step in the development of a waterfront site convenient to both the transmission facilities and the growing industries.
Keywords :
Batteries; Boilers; Fans; Generators; Oil insulation; Relays; Windings;
Journal_Title :
Electrical Engineering
DOI :
10.1109/EE.1945.6441234