DocumentCode :
14766
Title :
Placement of PMUs Considering Measurement Phase-Angle Mismatch
Author :
Peng Yang ; Zhao Tan ; Wiesel, Ami ; Nehorai, Arye
Author_Institution :
Preston M. Green Dept. of Electr. & Syst. Eng., Washington Univ. in St. Louis, St. Louis, MO, USA
Volume :
30
Issue :
2
fYear :
2015
fDate :
Apr-15
Firstpage :
914
Lastpage :
922
Abstract :
Phasor measurement units (PMUs) are becoming an important component in the power grid. The PMUs provide time-synchronized measurements of multiple remote measurement points, enabling more accurate and real-time monitoring of the system state. Heuristically, it is difficult to tell how the placement of a PMU at a specific location in the power system would affect the state estimation error, not to say the effect of the PMU synchronization and measurement accuracy. In this paper, we derive the posterior Cramér-Rao bound (PCRB) on the state estimation error based on a measurement model which considers the phase-angle mismatch from PMU measurements. We then propose a PMU placement strategy using the derived PCRB. The greedy algorithm is used to solve the optimization problem. The results are then compared with other heuristics, with the optimal solution through an exhaustive search (for small systems), and with a lower bound on the optimal placement obtained through convex relaxation. For some design criteria, the objective functions are submodular, which guarantees a performance bound on the greedy solution. For other design criteria where the objective functions are not submodular, numerical examples demonstrate the effectiveness of the greedy algorithms.
Keywords :
convex programming; greedy algorithms; phasor measurement; power grids; power system measurement; relaxation theory; state estimation; Cramér-Rao bound; PMU measurements; PMU placement strategy; PMU synchronization; convex relaxation; greedy algorithms; greedy solution; measurement phase-angle mismatch; multiple remote measurement points; optimization problem; phase-angle mismatch; phasor measurement units; power grid; power system; real-time monitoring; state estimation error; system state; time-synchronized measurements; Current measurement; Greedy algorithms; Linear programming; Phase measurement; Phasor measurement units; State estimation; Voltage measurement; Phase-angle mismatch; phasor measurement unit (PMU); posterior Cramér-Rao bound; sensor placement; state estimation;
fLanguage :
English
Journal_Title :
Power Delivery, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8977
Type :
jour
DOI :
10.1109/TPWRD.2014.2365550
Filename :
6937191
Link To Document :
بازگشت