DocumentCode
1479969
Title
Power R&D: more watts, but less to pay
Author
Drummond, Marcio ; Neto, Joao De Moraes MARTINS ; Meirelles, Marcello Penello
Author_Institution
Cepel, Brazil
Volume
33
Issue
7
fYear
1996
fDate
7/1/1996 12:00:00 AM
Firstpage
60
Lastpage
62
Abstract
Thousands of kilometers separate the hydroelectric sources on the Amazon from main load centers far to the south. If Brazil is to transmit many megawatts of power over such distances, it must develop technology that is more efficient and less costly than what is in use today. For this and other pressing needs in the power field, the country´s federally owned holding company in charge of power generation and transmission, Electrobras, turns to the country´s leading power R&D center, Cepel. Both organizations are based in Rio de Janeiro. This paper details four of Cepel´s many projects which are of particularly broad interest. One is an optimized design of conductor bundles for AC transmission lines, Another is a test station for DC equipment up to 800 kV. Then there is software for the stability analysis of large transmission systems, which may involve thousands of buses and branches. Fourth and last, an inexpensive electronic ampere-hour meter is being developed for customers with low incomes, who seldom use more than 100 kWh per month
Keywords
power system analysis computing; power system stability; power transmission; power transmission lines; project engineering; research initiatives; transmission networks; AC transmission lines; Brazil; Cepel; DC equipment; R&D; conductor bundles; hydroelectric sources; long-distance power transmission; projects; research efforts; transmission system stability analysis; Conductors; Costs; Design optimization; Electric fields; HVDC transmission; Power transmission lines; Pressing; Research and development; System testing; Voltage;
fLanguage
English
Journal_Title
Spectrum, IEEE
Publisher
ieee
ISSN
0018-9235
Type
jour
DOI
10.1109/6.526868