DocumentCode :
1481574
Title :
Minimum-cost loading of transformers
Author :
Klopfenstein, Arthur
Author_Institution :
Southern California Edison Company. Los Angeles, Calif.
Volume :
75
Issue :
9
fYear :
1956
Firstpage :
791
Lastpage :
791
Abstract :
A POWER TRANSFORMER can be loaded for minimum cost per kva. Costs to be considered are the capital costs of interest, insurance, and taxes, as well as the operating costs of depreciation, losses, and maintenance. All these costs can be related to loading if an adjusted transformer rating is used. This adjusted rating is the peak load to be allowed before additional capacity is provided.
Keywords :
Aging; Irrigation; Laboratories; Loading; Maintenance engineering; Power transformer insulation;
fLanguage :
English
Journal_Title :
Electrical Engineering
Publisher :
ieee
ISSN :
0095-9197
Type :
jour
DOI :
10.1109/EE.1956.6442125
Filename :
6442125
Link To Document :
بازگشت