Title :
Pump-turbine addition at TVA hiwassee hydro plant
Author :
Sellers, L. R. ; Kirkland, J. E.
Author_Institution :
Tennessee Valley Authority, Knoxville, Tenn.
fDate :
3/1/1956 12:00:00 AM
Abstract :
Studies in preparation for the installation of a second unit at Hiwassee Dam showed that the 26-per-cent additional installed cost of a pumpturbine-type unit was justified by economic and operating advantages. Design and operation characteristics of this 80,000-hp unit, as well as the field test to begiven after initial operation, are discussed.
Keywords :
Discharges (electric); Generators; Impellers; Insulation; Logic gates; Reactive power; Turbines;
Journal_Title :
Electrical Engineering
DOI :
10.1109/EE.1956.6442506