DocumentCode
1487999
Title
Going the Distance
Author
Aredes, Maurício ; DIAS, ROBSON ; AQUINO, ANTONIO FELIPE DA CUNHA DE ; PORTELA, CARLOS ; WATANABE, EDSON
Author_Institution
Fluminense Fed. Univ., Rio de Janeiro, Brazil
Volume
5
Issue
1
fYear
2011
fDate
3/1/2011 12:00:00 AM
Firstpage
36
Lastpage
48
Abstract
The transmission of bulk power over long distances is a very current topic in the worldwide energy sector. An excellent example is the transmission system of Madeira River Hydropower Generation Project in Brazil, which includes two 2,400-km transmission lines, designed to transmit 3,150 MW through each HVDC link. In fact, long transmission trunks enable the use of natural resources that are far from major load centers as well as provide the interconnection of large power systems.
Keywords
HVDC power transmission; power system interconnection; power transmission lines; Brazil; HVDC link; Madeira River Hydropower Generation Project; power 3150 MW; power system interconnection; power transmission; size 2400 km; transmission line; worldwide energy sector; Capacitors; HVDC transmission; Power conversion; Power transmission lines; Snubbers;
fLanguage
English
Journal_Title
Industrial Electronics Magazine, IEEE
Publisher
ieee
ISSN
1932-4529
Type
jour
DOI
10.1109/MIE.2011.940252
Filename
5742575
Link To Document