    Going the Distance

  • Author

    Aredes, Maurício ; DIAS, ROBSON ; AQUINO, ANTONIO FELIPE DA CUNHA DE ; PORTELA, CARLOS ; WATANABE, EDSON

  • Author_Institution
    Fluminense Fed. Univ., Rio de Janeiro, Brazil
  • Volume
    5
  • Issue
    1
  • fYear
    2011
  • fDate
    3/1/2011 12:00:00 AM
  • Firstpage
    36
  • Lastpage
    48
  • Abstract
    The transmission of bulk power over long distances is a very current topic in the worldwide energy sector. An excellent example is the transmission system of Madeira River Hydropower Generation Project in Brazil, which includes two 2,400-km transmission lines, designed to transmit 3,150 MW through each HVDC link. In fact, long transmission trunks enable the use of natural resources that are far from major load centers as well as provide the interconnection of large power systems.
  • Keywords
    HVDC power transmission; power system interconnection; power transmission lines; Brazil; HVDC link; Madeira River Hydropower Generation Project; power 3150 MW; power system interconnection; power transmission; size 2400 km; transmission line; worldwide energy sector; Capacitors; HVDC transmission; Power conversion; Power transmission lines; Snubbers;
  • fLanguage
    English
  • Journal_Title
    Industrial Electronics Magazine, IEEE
  • Publisher
    ieee
  • ISSN
    1932-4529
  • Type

    jour

  • DOI
    10.1109/MIE.2011.940252
  • Filename
    5742575