DocumentCode :
1487999
Title :
Going the Distance
Author :
Aredes, Maurício ; DIAS, ROBSON ; AQUINO, ANTONIO FELIPE DA CUNHA DE ; PORTELA, CARLOS ; WATANABE, EDSON
Author_Institution :
Fluminense Fed. Univ., Rio de Janeiro, Brazil
Volume :
5
Issue :
1
fYear :
2011
fDate :
3/1/2011 12:00:00 AM
Firstpage :
36
Lastpage :
48
Abstract :
The transmission of bulk power over long distances is a very current topic in the worldwide energy sector. An excellent example is the transmission system of Madeira River Hydropower Generation Project in Brazil, which includes two 2,400-km transmission lines, designed to transmit 3,150 MW through each HVDC link. In fact, long transmission trunks enable the use of natural resources that are far from major load centers as well as provide the interconnection of large power systems.
Keywords :
HVDC power transmission; power system interconnection; power transmission lines; Brazil; HVDC link; Madeira River Hydropower Generation Project; power 3150 MW; power system interconnection; power transmission; size 2400 km; transmission line; worldwide energy sector; Capacitors; HVDC transmission; Power conversion; Power transmission lines; Snubbers;
fLanguage :
English
Journal_Title :
Industrial Electronics Magazine, IEEE
Publisher :
ieee
ISSN :
1932-4529
Type :
jour
DOI :
10.1109/MIE.2011.940252
Filename :
5742575
Link To Document :
بازگشت